Development and use frame of programme management system for organization
(1) Department of Information and Communication Technology, Politeknik Kuala Terengganu  Malaysia
(2) Department of Information and Communication Technology, Politeknik Kuala Terengganu  Malaysia
(3) Department of Electrical Engineering, Politeknik Kuala Terenggan  Malaysia
Corresponding Author
DOI : https://doi.org/10.32698/01581
Full Text: Language :
Abstract
The frame of Programme Management System for organization is an online system which has basic functions to manage information about certain program. These include courses, workshop or event, participant’s information such as attendance, as well as generating document, for example certification of attendance and report for organization. In fulfilling problem statement for attendance, it is not available since it cannot be administered face to face due to pandemic Covid’19. Next, it is costly to print certificate for participants and it also involved postage cost. Lastly, difficulty in getting the updated list of participants. The objectives of this project are to design, develop and implement an online system in real situation. Methodology used is Prototype, whereby the developing of system is simultaneously administered with the implementation. In conclusion, this project helps organization to run programmes smoothly.
References
Xie, X., Siau, K., &Fui-Hoon Nah, F. (2020). Journal of Information Technology Case and Application Research, 22(3), 175–187. https://doi.org/ https://doi.org/10.1080/15228053.2020.1824884
Lutkevich, B. (2020, August 3). What is framework? - definition from whatis.com. WhatIs.com. Retrieved August 14, 2022, from https://www.techtarget.com/whatis/definition/framework
D.Peterson, G., &A.Teegarden, D. (2007). Verification system. Verification System - an overview | ScienceDirect Topics. Retrieved August 14, 2022, from https://www.sciencedirect.com/topics/computer-science/verification-system
Schedlbauer, M. (2011, February 23). Requirements prioritization strategies. Project Management Articles, Webinars, Templates and Jobs. Retrieved August 14, 2022, from https://www.projecttimes.com/articles/requirements-prioritization-strategies/
TANABE, M., & KOBAYASHI, N. (2020). A Method to Visualize the Scope with No Data Leakage: Context Diagram and Assurance Cases Should Do, 1–8.
Sommerville, I. (2007). Software engineering. Addison-Wesley.
Article Metrics
Abstract Views : 95 timesPDF Downloaded : 25 times
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.